Engine Overhaul Building Loading Engine onto a Tractor Trailer Engine Turning Fixture Engine Lifting Fixture Complete, Painted Engine

What's New?

The Vista Corporation has opened it's new 30,000 square foot facility and has started remanufacturing locomotive engines. This facility houses a 40 ton top running bridge crane. The production line features a rail mounted engine block rotating fixture and floor mounted jib cranes in the assembly and disassembly areas. The wash bay is outfitted with state of the art waste water handling equipment that exceeds environmental protection regulations. There are four shipping and receiving docks outfitted to handle all types of trucks.

Products that we produce(Links)

GE Power Assembly
EMD Power Assembly
Governors
Water Pump
V1/V2 Valve
Dual Flow Valve
Cam Journal
Engine